← Blog Live Workflow

A Pre-Decision Checklist for Planning Your Next Live Show Workflow

Priya Nair · · 6 min read

Start with the show you actually run

Before anyone drafts a single cue sheet, write down what the show is on a normal night. How long is it, how many segments does it have, and how many of them are live rather than played in? A twenty-minute news bulletin and a ninety-minute live magazine need very different paperwork, and mixing the two up is the quickest way to end up with a plan nobody follows.

I teach camera operators, so I see the result of vague planning from the studio floor. When the format is loosely described, the people on cameras are the last to learn what is expected, and they find out in the middle of a shot. A one-page description of the show, agreed by the producer and the gallery, saves a great deal of confusion later.

Put the description where the whole crew can read it. If it only lives in the producer's head, the plan will drift the first time someone is off sick.

  • Running time and number of segments
  • Which items are live and which are pre-recorded
  • Who is on set, and who is in the gallery
  • What usually goes wrong on a normal night

Check how your rundown will be built and kept

A rundown is only useful if everyone is reading the same version. Ask who owns it, who may change it, and how a change reaches the gallery, the floor and the presenter. If the answer is that several people edit separate copies, fix that before you plan anything else.

Think about the level of detail too. A rundown that lists only story slugs leaves the director guessing about camera moves and graphics. One that lists every micro-action becomes unreadable at speed. Aim for timings, source, the camera or shot needed, and any audio or graphic cue attached to each item.

Decide in advance what happens when the show overruns or runs short. Naming the items that can be dropped or stretched, in order, is far calmer than deciding it live with the clock running.

  • One owner for the master rundown
  • A clear route for late changes
  • Named items to drop or stretch

Ask what the cue sheet needs to say to each role

A cue sheet should not be one document trying to serve everyone. The vision mixer needs transitions and source numbers, the sound engineer needs microphone opens and music levels, and the camera operators need shot numbers and where to be when. If one sheet carries it all, people stop reading it.

When I coach framing, the cue that matters most to an operator is the one that tells them what comes next before the red light moves. Check that your sheet gives each camera its next shot early enough to prepare, not just in time to react.

Test the sheet on someone who has not seen the show. If a newcomer cannot follow a segment from the paper alone, a tired crew member at the end of a long day will struggle too.

  • Separate views for vision, sound and cameras
  • Next shot visible before it is needed
  • Tested on a person new to the show

Look hard at crew communication

Most live problems are communication problems, not equipment ones. Ask who can talk to whom during the show, on which channel, and who is allowed to interrupt. Floor manager, director, producer and audio each need a clear line, and the presenter's earpiece needs its own rules.

Agree a short, shared vocabulary for common moments: ready, standby, go, stretch, wrap. It sounds small, but a crew using the same few words speaks less and is understood more. Quiet galleries are usually well-planned galleries.

Decide what happens when the main talkback fails. A backup, even a simple one such as hand signals from the floor manager, should be written into the plan and rehearsed at least once, not discovered in the middle of a bulletin.

  • Channel map for every role
  • A small shared vocabulary
  • A rehearsed fallback if talkback drops

Test the plan against a rehearsal, not a meeting

A plan that looks sound on paper can fall apart at the first run. Before you decide it is ready, schedule a rehearsal that follows the real rundown at real speed, with the real people in their real seats. A walk-through in a meeting room will not expose a camera that cannot reach its mark in time.

During the run, watch for the places where people hesitate. Hesitation shows you where a cue is unclear, a handover is missing or a move is too tight. Note each one and fix the paperwork rather than telling people to try harder.

Keep the rehearsal honest about timing. If a segment ran long in practice, do not assume it will shrink on air. Adjust the rundown, then run that part again and see whether the change actually helped.

  • Rehearse at real speed
  • Record every hesitation
  • Change the paper, not just the people

Decide what help you need, and what you can do yourselves

Last, be frank about the gaps. Some crews have strong producers but no habit of writing cue sheets. Others have tidy paperwork and weak communication. Work out which of the earlier points you could handle with an afternoon of effort, and which would benefit from an outside view.

If you do bring in help, ask what you will keep afterwards. Good planning leaves behind templates, a rundown format and a comms map your own crew can maintain, rather than a dependency on the person who wrote them.

Also agree what success looks like before you start: fewer late changes, a calmer gallery, shows that finish on time. A measure chosen in advance lets you judge honestly whether the new workflow is doing its job.

  • Which gaps you can close in-house
  • What you keep once the work is done
  • How you will judge the result

A live show workflow earns its place when the crew trusts it under pressure. Work through the format, rundown, cue sheets, communication and rehearsal honestly, then decide how much support you need. If several answers come back vague, that is useful: it shows where planning will repay the effort first, and where a calmer gallery begins.

Get in touch

breaknixup

Studio production support from Salisbury: equipment setup, camera training, lighting, sound and live show workflow planning for television news and live shows.

14 Fisherton Mill Lane, Salisbury SP2 7SU01722 410286hello@breaknixup.org