How a Live Show Rundown Gets Built, Revised and Run
A look at how we draft a rundown, build the cue sheet and agree crew talkback before a live show, and what changes between the first draft and the one on the gallery desk.
Priya Nair · · 6 min read
Starting from the running order, not the kit
- Slot length and fixed break times
- Items that can flex and items that cannot
- Who calls changes and how they are passed on
Turning the rundown into a cue sheet
- One phrase per action, used the same way by everyone
- A named fallback beside every risky cue
- Cue sheets short enough to read at a glance
Agreeing how the crew talks to each other
- Separate channels for production and technical talk where possible
- Listening-only roles marked on the sheet
- One named person who can pull or reorder an item
The first rehearsal and what it exposes
- Mark hesitation, not just mistakes
- Short repeat passes over problem transitions
- Update paper and talkback rules together
Keeping the plan alive once the show is on air
- A short review after the first few transmissions
- Update documents when the real habit is better
- A simple incident log kept by the gallery
What this looks like for a small crew
Good workflow planning is mostly patient, practical work: watching how a team really operates, writing down only what helps, and testing it before the show depends on it. The result is not a rigid script but a shared understanding of who does what and when. If your live programme feels rushed, a close look at the rundown and the talkback is usually the best place to start.